ABOUT THIS PROJECT

Jacobsen 5MW Solar
Interconnection Substation

This project involved the complete installation of a 12.47kV substation. After the site was prepared, SES set the structural steel and installed all connection bolts, grounding hardware and underground cable. Crews also completed wiring for the circuit breaker, timed group-operated switches, the cool cell control shelter, and systems control.  The project also required installation of a lightning protection system, DC battery back-up power, and project commissioning support. The tight project timeline was completed ahead of schedule to specifications with no safety incidents.